Keep everyone on the same artwork version.

A small change deserves a clear record.

Explore the guide

AI-generated explanatory illustrations show concepts, not actual company facilities, employees or completed client work. Technical drawings and production specifications must come from the responsible supplier or converter.

Name files consistently.

Use a stable job identifier with the product, size or variant and a revision. An example is JOB-104_Tea-250g_EN_R03. Agree the naming convention with the team and avoid relying on labels such as final-final.

Illustration: Two revisions of printed flexible packaging artwork being compared beside a packet.
Records

Identify the approved version

Give each revision a clear identity. Record the approved filename and date to help distinguish current artwork from superseded copies.

Record what changed.

Keep a short log of the revision, requested change, requester and approval. Distinguish a text correction from a format or colour change so the relevant technical checks can be repeated.

Illustration: Marked and clean blue potato-chip packet proofs beside a filled glossy pack.
Review

Make corrections specific

Mark the exact location and describe each change. After revision, review the new proof and record a fresh approval where required.

Explore the guide

Protect the approved master.

Store the approved release separately from working files and earlier concepts. Make obsolete versions clearly identifiable. The file sent to tooling or printing should match the recorded approval.

Illustration: Hands passing a job folder and clear sleeve containing glossy packet proofs.
Handoff

Package the release files

Hand over the agreed files, named revision and supporting references together. Identify who receives the release and what they should do next.

Explore the guide
Illustration: One green spice-packet artwork proof handed over while other project folders remain closed.
File sharing

Share the relevant project files

Agree the receiving route before sharing confidential artwork. Send the relevant project files and access instructions without including unrelated information.

Explore the guide

Notify affected stages.

A revision may affect proofs, separations, cylinders, plates or printing already scheduled. Review the consequences before release and record the replacement version and authorisation.

Illustration: Supported metal cylinder, retained glossy noodle-wrapper sample, packet and job record.
Repeat orders

Connect the repeat order

Find the original job reference before ordering again. Check artwork changes, tooling availability, condition and current production requirements.

Explore the guide
Illustration: Two colleagues reviewing a blue printed biscuit-film roll and flat sample beside supported tooling.
Handoff

Connect the production team

Bring the converter’s specification into the artwork conversation. Identify who approves the files and who takes responsibility for the next production stage.

Explore the guide

Good things start with a conversation

Let’s create packaging
that gets noticed.

Bring your idea, artwork or specification. We’ll help you find a clear next step.

Discuss a project Start with a project checklist
WhatsApp