AI-generated explanatory illustrations show concepts, not actual company facilities, employees or completed client work. Technical drawings and production specifications must come from the responsible supplier or converter.
Name files consistently.
Use a stable job identifier with the product, size or variant and a revision. An example is JOB-104_Tea-250g_EN_R03. Agree the naming convention with the team and avoid relying on labels such as final-final.

Identify the approved version
Give each revision a clear identity. Record the approved filename and date to help distinguish current artwork from superseded copies.
Record what changed.
Keep a short log of the revision, requested change, requester and approval. Distinguish a text correction from a format or colour change so the relevant technical checks can be repeated.

Make corrections specific
Mark the exact location and describe each change. After revision, review the new proof and record a fresh approval where required.
Explore the guideProtect the approved master.
Store the approved release separately from working files and earlier concepts. Make obsolete versions clearly identifiable. The file sent to tooling or printing should match the recorded approval.

Package the release files
Hand over the agreed files, named revision and supporting references together. Identify who receives the release and what they should do next.
Explore the guide
Share the relevant project files
Agree the receiving route before sharing confidential artwork. Send the relevant project files and access instructions without including unrelated information.
Explore the guideNotify affected stages.
A revision may affect proofs, separations, cylinders, plates or printing already scheduled. Review the consequences before release and record the replacement version and authorisation.

Connect the repeat order
Find the original job reference before ordering again. Check artwork changes, tooling availability, condition and current production requirements.
Explore the guide
Connect the production team
Bring the converter’s specification into the artwork conversation. Identify who approves the files and who takes responsibility for the next production stage.
Explore the guide